TPS23752EVM-145

Mfr. #: TPS23752EVM-145
製造商: Texas Instruments
描述: Power Management IC Development Tools TPS23752 Eval Mod
生命週期: 製造商新產品
數據表: TPS23752EVM-145 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS23752EVM-145 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Over Ethernet type. 0 V to 57 V Input Voltage Output Voltage is 5 V Output current: 5 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS23752. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.509254 oz of Unit Weight

TPS23752EVM-145 Image

TPS23752EVM-145

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS23752EVM-145 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Power Over Ethernet
  • Tool Is For Evaluation Of: TPS23752
  • Input Voltage: 0 V to 57 V
  • Output Voltage: 5 V
  • Description/Function: The TPS23752EVM-145 evaluation module helps designers evaluate the performance of the TPS23752 IEEE 802.3at PoE Interface and Green-mode DC/DC Controller
  • Output Current: 5 A
  • Series: TPS23752
  • Brand: Texas Instruments
  • For Use With: TPS23752
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.509254 oz

TPS23752EVM-145

TPS23752EVM-145 Specifications

TPS23752EVM-145 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Over Ethernet.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 0 V to 57 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 5 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS23752.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.509254 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top