TPS43332EVM

Mfr. #: TPS43332EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools TPS43332EVM Eval Mod
生命週期: 製造商新產品
數據表: TPS43332EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS43332EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 2 V to 40 V Input Voltage Output Voltage is 3.3 V, 5 V Output current: 4 A, 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS43332EVM Image

TPS43332EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS43332EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS43332
  • Input Voltage: 2 V to 40 V
  • Output Voltage: 3.3 V, 5 V
  • Description/Function: Evaluation module for the TPS43332 switch mode power supply
  • Output Current: 4 A, 2 A
  • Series: TPS43332
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS43332EVM

TPS43332EVM Specifications

TPS43332EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2 V to 40 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 3.3 V, 5 V

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 4 A, 2 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top