TPS54525EVM-608

Mfr. #: TPS54525EVM-608
製造商: Texas Instruments
描述: Power Management IC Development Tools TPS54525 Eval Mod
生命週期: 製造商新產品
數據表: TPS54525EVM-608 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54525EVM-608 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 18 V Input Voltage Output Voltage is 0.76 V to 5.5 V Output current: 5.5 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS54525EVM-608 Image

TPS54525EVM-608

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54525EVM-608 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS54525
  • Input Voltage: 4.5 V to 18 V
  • Output Voltage: 0.76 V to 5.5 V
  • Output Current: 5.5 A
  • Series: TPS54525
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS54525EVM-608

TPS54525EVM-608 Specifications

TPS54525EVM-608 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4.5 V to 18 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 0.76 V to 5.5 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 5.5 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

19 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top