| Mfr. #: | TPS65140EVM-031 |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools TPS65140-031 Eval Mod |
| 生命週期: | 製造商新產品 |
| 數據表: | TPS65140EVM-031 數據表 |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Power Management Specialized type. 3.3 V Input Voltage Output Voltage is 10 V Dimensions of 62.2 mm x 53.3 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.203946 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65140EVM-031 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is Power Management Specialized.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 3.3 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 10 V
A: At what frequency does the Dimensions?
Q: The product Dimensions is 62.2 mm x 53.3 mm.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.203946 oz.