TPS65150EVM-697

Mfr. #: TPS65150EVM-697
製造商: Texas Instruments
描述: Power Management IC Development Tools TPS65150EVM-697
生命週期: 製造商新產品
數據表: TPS65150EVM-697 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65150EVM-697 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 1.8 V to 6 V Input Voltage Output Voltage is 15 V Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.056443 oz of Unit Weight

TPS65150EVM-697 Image

TPS65150EVM-697

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65150EVM-697 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: TPS65150
  • Input Voltage: 1.8 V to 6 V
  • Output Voltage: 15 V
  • Packaging: Bulk
  • Description/Function: TPS65150 low input voltage, compact LCD bias IC with VCOM evaluation module
  • Series: TPS65150
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.056443 oz

TPS65150EVM-697

TPS65150EVM-697 Specifications

TPS65150EVM-697 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Management Specialized

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 1.8 V to 6 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 15 V

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.056443 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top