TPS65266EVM-686

Mfr. #: TPS65266EVM-686
製造商: Texas Instruments
描述: Power Management IC Development Tools 2.7V to6.5V 3A/2A/2A evaluation module
生命週期: 製造商新產品
數據表: TPS65266EVM-686 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65266EVM-686 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 2.7 V to 6.5 V Input Voltage Output current: 2 A, 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS65266. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.149581 oz of Unit Weight

TPS65266EVM-686 Image

TPS65266EVM-686

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65266EVM-686 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65266
  • Input Voltage: 2.7 V to 6.5 V
  • Output Current: 2 A, 3 A
  • Series: TPS65266
  • Brand: Texas Instruments
  • For Use With: TPS65266
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.149581 oz

TPS65266EVM-686

TPS65266EVM-686 Specifications

TPS65266EVM-686 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is PMIC Solutions.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 2.7 V to 6.5 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 2 A, 3 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS65266.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.149581 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top