TPS65321EVM

Mfr. #: TPS65321EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools TPS65321EVM
生命週期: 製造商新產品
數據表: TPS65321EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65321EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 3.6 V to 36 V Input Voltage Output Voltage is 3.3 V, 5 V Output current: 280 mA, 3.2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.065401 oz of Unit Weight

TPS65321EVM Image

TPS65321EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65321EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS65321-Q1
  • Input Voltage: 3.6 V to 36 V
  • Output Voltage: 3.3 V, 5 V
  • Description/Function: TPS65321-Q1 a switch mode DC-DC step down converter
  • Output Current: 280 mA, 3.2 A
  • Series: TPS65321
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.065401 oz

TPS65321EVM

TPS65321EVM Specifications

TPS65321EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 3.6 V to 36 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V, 5 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 280 mA, 3.2 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.065401 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top