TPS746EVM-009

Mfr. #: TPS746EVM-009
製造商: Texas Instruments
描述: Power Management IC Development Tools TPS746EVM-009
生命週期: 製造商新產品
數據表: TPS746EVM-009 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS746EVM-009 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 6 V Input Voltage Output current: 1 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS746EVM-009 Image

TPS746EVM-009

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS746EVM-009 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS74601DRV
  • Input Voltage: 6 V
  • Output Current: 1 A
  • Series: TPS746
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS746EVM-009

TPS746EVM-009 Specifications

TPS746EVM-009 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 6 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 1 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

12 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top