TPS7B4254EVM

Mfr. #: TPS7B4254EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools TPS7B4254-Q1 VOLTAGE-TRACKING LDO EVM
生命週期: 製造商新產品
數據表: TPS7B4254EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7B4254EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 4 V to 40 V Input Voltage Output Voltage is 2 V to 40 V Output current: 150 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.034646 oz of Unit Weight

TPS7B4254EVM Image

TPS7B4254EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B4254EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7B4254-Q1
  • Input Voltage: 4 V to 40 V
  • Output Voltage: 2 V to 40 V
  • Output Current: 150 mA
  • Series: TPS7B4254-Q1
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.034646 oz

TPS7B4254EVM

TPS7B4254EVM Specifications

TPS7B4254EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is LDO Voltage Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4 V to 40 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 2 V to 40 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 150 mA

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.034646 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top