| Mfr. #: | TPS7B6950EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools TPS7B6950EVM |
| 生命週期: | 製造商新產品 |
| 數據表: | TPS7B6950EVM 數據表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Linear Voltage Regulators type. 5.5 V to 40 V Input Voltage Bulk packaging for easy dispensing Output current: 150 mA Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B6950EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Linear Voltage Regulators.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 5.5 V to 40 V.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 150 mA
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 125 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.