TPS92690EVM

Mfr. #: TPS92690EVM
製造商: Texas Instruments
描述: LED Lighting Development Tools TPS92690 EVAL MOD
生命週期: 製造商新產品
數據表: TPS92690EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS92690EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with TPS92690. Output current: 500 mA Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 4.350 lbs of Unit Weight

TPS92690EVM Image

TPS92690EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS92690EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • For Use With: TPS92690
  • Series: TPS92690
  • Description/Function: Evaluates the operation and performance of the TPS92690 DC-DC N-channel MOSFET controller
  • Output Current: 500 mA
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 4.350 lbs

TPS92690EVM

TPS92690EVM Specifications

TPS92690EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS92690

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 500 mA

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is LED Lighting Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 4.350 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top