TSW14DL3200EVM

Mfr. #: TSW14DL3200EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools TSW14DL3200 EVM
生命週期: 製造商新產品
數據表: TSW14DL3200EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW14DL3200EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC and DAC type. 10 V to 14 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TSW14DL3200EVM Image

TSW14DL3200EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW14DL3200EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC and DAC
  • Tool Is For Evaluation Of: TSW14DL3200
  • Operating Supply Voltage: 10 V to 14 V
  • Description/Function: High-speed data LVDS capture and pattern generator card
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Current: 3 A
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW14DL3200EVM

TSW14DL3200EVM Specifications

TSW14DL3200EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC and DAC

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 10 V to 14 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top