TSW30SH84EVM

Mfr. #: TSW30SH84EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools Complete RF Signal Chain Eval Mod
生命週期: 製造商新產品
數據表: TSW30SH84EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW30SH84EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the DAC type. Texas Instruments is a trusted brand for quality electronics Interface Type: LVDS Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TSW30SH84EVM Image

TSW30SH84EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW30SH84EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: DAC
  • Tool Is For Evaluation Of: DAC30SH84
  • Description/Function: Wideband transmit signal chain evaluation board and reference design
  • Brand: Texas Instruments
  • Interface Type: LVDS
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW30SH84EVM

TSW30SH84EVM Specifications

TSW30SH84EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed LVDS

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top