TVP5160EVM

Mfr. #: TVP5160EVM
製造商: Texas Instruments
描述: Video IC Development Tools TVP5160 Eval Mod
生命週期: 製造商新產品
數據表: TVP5160EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TVP5160EVM Overview

This product is manufactured by Texas Instruments. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Composite, I2C, S-Video Video IC Development Tools product type 1 of 100 Development Tools as subcategory

TVP5160EVM Image

TVP5160EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TVP5160EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Video IC Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TVP5160
  • Operating Supply Voltage: 5 V
  • Brand: Texas Instruments
  • Interface Type: Composite, I2C, S-Video
  • Product Type: Video IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TVP5160EVM

TVP5160EVM Specifications

TVP5160EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Composite, I2C, S-Video.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Video IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top