UCC24610EVM-563

Mfr. #: UCC24610EVM-563
製造商: Texas Instruments
描述: Power Management IC Development Tools UCC24610EVM-563
生命週期: 製造商新產品
數據表: UCC24610EVM-563 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC24610EVM-563 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Gate Drivers type. 85 VAC to 265 VAC Input Voltage Output Voltage is 5 V Dimensions of 3.5 in x 2.3 in x 1 in Output current: 5 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

UCC24610EVM-563 Image

UCC24610EVM-563

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC24610EVM-563 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Gate Drivers
  • Tool Is For Evaluation Of: UCC24610
  • Input Voltage: 85 VAC to 265 VAC
  • Output Voltage: 5 V
  • Dimensions: 3.5 in x 2.3 in x 1 in
  • Output Current: 5 A
  • Series: UCC24610
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

UCC24610EVM-563

UCC24610EVM-563 Specifications

UCC24610EVM-563 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Gate Drivers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 85 VAC to 265 VAC.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 3.5 in x 2.3 in x 1 in.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 5 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top