UCC24636EVM

Mfr. #: UCC24636EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools EVM FOR THE UCC24636 SR CONTROLLER
生命週期: 製造商新產品
數據表: UCC24636EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC24636EVM Overview

This product is manufactured by Texas Instruments. Demonstration Boards This device belongs to the Power Management Specialized type. 5 V to 24 V Input Voltage Output Voltage is 5 V to 12 V Output current: - Texas Instruments is a trusted brand for quality electronics Compatible with UCC24636. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

UCC24636EVM Image

UCC24636EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC24636EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Demonstration Boards
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: UCC24636
  • Input Voltage: 5 V to 24 V
  • Output Voltage: 5 V to 12 V
  • Description/Function: Secondary-side synchronous rectifier controller diode replacement demonstration board
  • Output Current: -
  • Series: UCC24636
  • Brand: Texas Instruments
  • For Use With: UCC24636
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

UCC24636EVM

UCC24636EVM Specifications

UCC24636EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Demonstration Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 5 V to 24 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5 V to 12 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is -.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is UCC24636.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top