| Mfr. #: | UCC25600EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools UCC25600EVM |
| 生命週期: | 製造商新產品 |
| 數據表: | UCC25600EVM 數據表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the AC/DC Converters type. 390 V Input Voltage Output Voltage is 12 V Dimensions of 1.38 in x 1.33 in Output current: 25 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 45 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC25600EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is AC/DC Converters.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 390 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 12 V.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 1.38 in x 1.33 in.
A: What is the Output Current of the product?
Q: The Output Current of the product is 25 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 45 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.