| Mfr. #: | XTR108EVM-USB |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Data Conversion IC Development Tools XTR108 Eval Module USB Version |
| 生命週期: | 製造商新產品 |
| 數據表: | XTR108EVM-USB 數據表 |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage to Current Converters type. 12 V to 24 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.645523 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

XTR108EVM-USB Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: What is the Type of the product?
Q: The Type of the product is Voltage to Current Converters.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 12 V to 24 V.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is Data Conversion IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.645523 oz.