ADS4122EVM

Mfr. #: ADS4122EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR ADS4122
生命週期: 製造商新產品
數據表: ADS4122EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4122EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: CMOS, LVDS, Serial, Parallel 12 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS4122 This tool is designed for the ADS4122. SPI interface type

ADS4122EVM Image

ADS4122EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4122EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4122
  • Power-Typ-Conditions -
  • Tool-Is-For-Evaluation-Of ADS4122
  • Interface-Type SPI

ADS4122EVM

ADS4122EVM Specifications

ADS4122EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 65M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is CMOS, LVDS, Serial, Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS4122.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS4122.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$346.20
US$346.20
10
US$328.89
US$3 288.90
100
US$311.58
US$31 158.00
500
US$294.27
US$147 135.00
1000
US$276.96
US$276 960.00
Top