ADS4246EVM

Mfr. #: ADS4246EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR ADS4246
生命週期: 製造商新產品
數據表: ADS4246EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4246EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 160M. Data-Interface: CMOS, LVDS, Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS4246 This tool is designed for the ADS4246. USB interface type

ADS4246EVM Image

ADS4246EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4246EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 160M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4246
  • Power-Typ-Conditions -
  • Tool-Is-For-Evaluation-Of ADS4246
  • Interface-Type USB

ADS4246EVM

ADS4246EVM Specifications

ADS4246EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 160M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed CMOS, LVDS, Serial, Parallel

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS4246.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS4246.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$448.50
US$448.50
10
US$426.08
US$4 260.75
100
US$403.65
US$40 365.00
500
US$381.22
US$190 612.50
1000
US$358.80
US$358 800.00
Top