ADS42B49EVM

Mfr. #: ADS42B49EVM
製造商: Texas Instruments
描述: MODULE EVAL FOR ADS42B49
生命週期: 製造商新產品
數據表: ADS42B49EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS42B49EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS42B49 amplifier. This product's 250M. Data-Interface: LVDS - Parallel, Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS42B49 This product operates at a 5 V supply voltage for reliable performance. This product is an ADS42B49EVM evaluation module. This tool is designed for the ADS42B49. 330 mA is 92 nA. Parallel Serial interface type

ADS42B49EVM Image

ADS42B49EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS42B49EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS42B49
  • Sampling-Rate-Per-Second 250M
  • Data-Interface LVDS - Parallel, Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS42B49
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V
  • Description-Function ADS42B49EVM evaluation module
  • Tool-Is-For-Evaluation-Of ADS42B49
  • Operating-Supply-Current 330 mA
  • Interface-Type Parallel Serial

ADS42B49EVM

ADS42B49EVM Specifications

ADS42B49EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADS42B49.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 250M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed LVDS - Parallel, Serial

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS42B49.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is ADS42B49EVM evaluation module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS42B49.

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 330 mA

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is Parallel Serial.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$448.50
US$448.50
10
US$426.08
US$4 260.75
100
US$403.65
US$40 365.00
500
US$381.22
US$190 612.50
1000
US$358.80
US$358 800.00
Top