ADS5481EVM

Mfr. #: ADS5481EVM
製造商: Texas Instruments
描述: EVALUATON MODULE FOR ADS5481
生命週期: 製造商新產品
數據表: ADS5481EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5481EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 80M. Data-Interface: Parallel 16 bits 1 units Input range: 3 Vpp Included item: Board. IC package type: ADS5481 This product operates at a 6 V to 36 V supply voltage for reliable performance. This tool is designed for the ADS5481. SMA interface type

ADS5481EVM Image

ADS5481EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5481EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 80M
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 3 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5481
  • Power-Typ-Conditions 2.15W @ 80MSPS
  • Operating-Supply-Voltage 6 V to 36 V
  • Tool-Is-For-Evaluation-Of ADS5481
  • Interface-Type SMA

ADS5481EVM

ADS5481EVM Specifications

ADS5481EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 80M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 3 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5481

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 6 V to 36 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS5481.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$346.23
US$346.23
10
US$328.92
US$3 289.18
100
US$311.61
US$31 160.70
500
US$294.30
US$147 147.75
1000
US$276.98
US$276 984.00
Top