ADS6223EVM

Mfr. #: ADS6223EVM
製造商: Texas Instruments
描述: ADS6223EVM
生命週期: 製造商新產品
數據表: ADS6223EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6223EVM Overview

Product belongs to the - series. This product's 80M. Data-Interface: Serial, Parallel 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6223

ADS6223EVM Image

ADS6223EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6223EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 80M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6223
  • Power-Typ-Conditions 350mW @ 80MSPS

ADS6223EVM

ADS6223EVM Specifications

ADS6223EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 80M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial, Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS6223.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$336.02
US$336.02
10
US$319.21
US$3 192.14
100
US$302.41
US$30 241.35
500
US$285.61
US$142 806.40
1000
US$268.81
US$268 812.00
Top