ADS7826EVM

Mfr. #: ADS7826EVM
製造商: Texas Instruments
描述: EVALUATION MODULE FOR ADS7826
生命週期: 製造商新產品
數據表: ADS7826EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7826EVM Overview

Product belongs to the microPOWER series. This product's 200k. Data-Interface: SPI 10 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS7826

ADS7826EVM Image

ADS7826EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7826EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Sampling-Rate-Per-Second 200k
  • Data-Interface SPI
  • Number-of-Bits 10
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7826
  • Power-Typ-Conditions -

ADS7826EVM

ADS7826EVM Specifications

ADS7826EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is microPOWER.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 200k

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed SPI

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 10.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ VREF.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS7826.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top