| Mfr. #: | ADS7834EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | EVAL MOD FOR ADS7834 |
| 生命週期: | 製造商新產品 |
| 數據表: | ADS7834EVM 數據表 |


Product belongs to the - series. This product's 500k. Data-Interface: Serial 12 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS7834

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7834EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 500k.
A: What is the Data-Interface of the product?
Q: The Data-Interface of the product is Serial.
A: Is the cutoff frequency of the product Number-of-Bits?
Q: Yes, the product's Number-of-Bits is indeed 12
A: Is the cutoff frequency of the product Number-of-A-D-Converters?
Q: Yes, the product's Number-of-A-D-Converters is indeed 1
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 0 ~ VREF.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS7834.