| Mfr. #: | ADS8317EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR ADS8317 |
| 生命週期: | 製造商新產品 |
| 數據表: | ADS8317EVM 數據表 |


Product belongs to the microPOWER series. This product's 250k. Data-Interface: SPI 16 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS8317

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8317EVM Specifications
A: At what frequency does the Series?
Q: The product Series is microPOWER.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 250k.
A: What is the Data-Interface of the product?
Q: The Data-Interface of the product is SPI.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 16.
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 1.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 0 ~ 5 V.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS8317.