ADS8380EVM

Mfr. #: ADS8380EVM
製造商: Texas Instruments
描述: EVALUATION MODULE FOR ADS8380
生命週期: 製造商新產品
數據表: ADS8380EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8380EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 600k. Data-Interface: Serial 18 bits 1 units Input range: 0 ~ 4.2 V Included item: Board. IC package type: ADS8380 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8380. SMA interface type

ADS8380EVM Image

ADS8380EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8380EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 600k
  • Data-Interface Serial
  • Number-of-Bits 18
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.2 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8380
  • Power-Typ-Conditions 115mW @ 600kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8380
  • Interface-Type SMA

ADS8380EVM

ADS8380EVM Specifications

ADS8380EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 600k

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 18.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 0 ~ 4.2 V

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8380.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8380

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$111.26
US$111.26
10
US$105.69
US$1 056.92
100
US$100.13
US$10 012.95
500
US$94.57
US$47 283.40
1000
US$89.00
US$89 004.00
Top