ADS8556EVM

Mfr. #: ADS8556EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR ADS8556
生命週期: 製造商新產品
數據表: ADS8556EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8556EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 450k, 630k. Data-Interface: Serial, Parallel 16 bits 6 units Input range: ±4 x VREF Included item: Board. IC package type: ADS8556 This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the ADS8556 ADS8557 ADS8558. SMA interface type

ADS8556EVM Image

ADS8556EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8556EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 450k, 630k
  • Data-Interface Serial, Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 6
  • Input-Range ±4 x VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8556
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V to 15 V
  • Tool-Is-For-Evaluation-Of ADS8556 ADS8557 ADS8558
  • Interface-Type SMA

ADS8556EVM

ADS8556EVM Specifications

ADS8556EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 450k, 630k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial, Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 16.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 6.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed ±4 x VREF

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS8556.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V to 15 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8556 ADS8557 ADS8558.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$148.50
US$148.50
10
US$141.08
US$1 410.75
100
US$133.65
US$13 365.00
500
US$126.22
US$63 112.50
1000
US$118.80
US$118 800.00
Top