AFE4404EVM

Mfr. #: AFE4404EVM
製造商: Texas Instruments
描述: EVAL MODULE AFE4404
生命週期: 製造商新產品
數據表: AFE4404EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE4404EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: Medical Pulse Oximeter Applications IC package type: AFE4404

AFE4404EVM Image

AFE4404EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE4404EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes Medical Pulse Oximeter Applications
  • Embedded -
  • Utilized-IC-Part AFE4404

AFE4404EVM

AFE4404EVM Specifications

AFE4404EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Analog Front End (AFE).

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Medical Pulse Oximeter Applications.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed AFE4404

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$298.50
US$298.50
10
US$283.58
US$2 835.75
100
US$268.65
US$26 865.00
500
US$253.72
US$126 862.50
1000
US$238.80
US$238 800.00
Top