AFE5801EVM

Mfr. #: AFE5801EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR AFE5801
生命週期: 製造商新產品
數據表: AFE5801EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5801EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Variable Gain Amplifiers This product is designed TSW1250EVM amplifier. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5801 This product operates at a 5 V supply voltage for reliable performance. This product is an 8-Channel Variable Gain Amplifier. This tool is designed for the AFE5801. SPI USB interface type

AFE5801EVM Image

AFE5801EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5801EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Variable Gain Amplifiers
  • For-Use-With TSW1250EVM
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5801
  • Operating-Supply-Voltage 5 V
  • Description-Function 8-Channel Variable Gain Amplifier
  • Tool-Is-For-Evaluation-Of AFE5801
  • Interface-Type SPI USB

AFE5801EVM

AFE5801EVM Specifications

AFE5801EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Variable Gain Amplifiers.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TSW1250EVM.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Analog Front End (AFE).

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 8 Channel LVDS Outputs

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is AFE5801.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed 8-Channel Variable Gain Amplifier

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is AFE5801.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$346.20
US$346.20
10
US$328.89
US$3 288.90
100
US$311.58
US$31 158.00
500
US$294.27
US$147 135.00
1000
US$276.96
US$276 960.00
Top