AFE5803EVM

Mfr. #: AFE5803EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR AFE5803
生命週期: 製造商新產品
數據表: AFE5803EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5803EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5803 Maximum operating temperature of + 70 C SPI interface type

AFE5803EVM Image

AFE5803EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5803EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5803
  • Maximum-Operating-Temperature + 70 C
  • Interface-Type SPI

AFE5803EVM

AFE5803EVM Specifications

AFE5803EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Analog Front End (AFE).

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 8 Channel LVDS Outputs.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is AFE5803.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 70 C.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$57.46
US$57.46
10
US$54.59
US$545.92
100
US$51.72
US$5 171.85
500
US$48.85
US$24 422.65
1000
US$45.97
US$45 972.00
Top