AFE5804EVM

Mfr. #: AFE5804EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR AFE5804
生命週期: 製造商新產品
數據表: AFE5804EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5804EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5804 This product operates at a 5 V supply voltage for reliable performance. This tool is designed for the AFE5804. RS-232 SMA interface type

AFE5804EVM Image

AFE5804EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5804EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5804
  • Operating-Supply-Voltage 5 V
  • Tool-Is-For-Evaluation-Of AFE5804
  • Interface-Type RS-232 SMA

AFE5804EVM

AFE5804EVM Specifications

AFE5804EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Analog Front End (AFE).

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 8 Channel LVDS Outputs

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is AFE5804.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is AFE5804.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is RS-232 SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$38.25
US$38.25
10
US$36.34
US$363.38
100
US$34.42
US$3 442.50
500
US$32.51
US$16 256.25
1000
US$30.60
US$30 600.00
Top