AFEDRI8201EVM

Mfr. #: AFEDRI8201EVM
製造商: Texas Instruments
描述: MODULE EVAL FOR AFEDRI8201
生命週期: 製造商新產品
數據表: AFEDRI8201EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFEDRI8201EVM Overview

Compatible with AFEDRI8201. Product belongs to the - series. Type: Front End This product's - range is 0Hz to 2.2GHz. Included item: Board, Cable, Power Supply.

AFEDRI8201EVM Image

AFEDRI8201EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFEDRI8201EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products AFEDRI8201
  • Series -
  • Type Front End
  • Frequency -
  • Supplied-Contents Board, Cable, Power Supply

AFEDRI8201EVM

AFEDRI8201EVM Specifications

AFEDRI8201EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is AFEDRI8201.

  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Type?

    Q: The product Type is Front End.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board, Cable, Power Supply.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top