BQ3055EVM

Mfr. #: BQ3055EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR BQ3055
生命週期: 製造商新產品
數據表: BQ3055EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ3055EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Battery Management The Power Management, Battery Gauge is the Main-Purpose. Primary-Attributes: - IC package type: BQ29440, BQ3055 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C Output voltage: 2.5 V 3.3 V This tool is designed for the BQ3055. Input Voltage Range: 25 V

BQ3055EVM Image

BQ3055EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ3055EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Battery Management
  • Main-Purpose Power Management, Battery Gauge
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part BQ29440, BQ3055
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Output-Voltage 2.5 V 3.3 V
  • Tool-Is-For-Evaluation-Of BQ3055
  • Input-Voltage 25 V

BQ3055EVM

BQ3055EVM Specifications

BQ3055EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Battery Gauge.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is BQ29440, BQ3055.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 85 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 2.5 V 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is BQ3055.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 25 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$149.24
US$149.24
10
US$141.77
US$1 417.73
100
US$134.31
US$13 431.15
500
US$126.85
US$63 424.90
1000
US$119.39
US$119 388.00
Top