CDCE62002EVM

Mfr. #: CDCE62002EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR CDCE62002
生命週期: 製造商新產品
數據表: CDCE62002EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE62002EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 4.25 MHz to 1.175 GHz range is 0Hz to 2.2GHz. The Timing, Clock Generator is the Main-Purpose. Primary-Attributes: - IC package type: CDCE62002 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDCE62002. USB interface type

CDCE62002EVM Image

CDCE62002EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE62002EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 4.25 MHz to 1.175 GHz
  • Main-Purpose Timing, Clock Generator
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part CDCE62002
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDCE62002
  • Interface-Type USB

CDCE62002EVM

CDCE62002EVM Specifications

CDCE62002EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Frequency Synthesizers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 4.25 MHz to 1.175 GHz.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Generator.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCE62002.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed CDCE62002

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$230.43
US$230.43
10
US$218.91
US$2 189.08
100
US$207.39
US$20 738.70
500
US$195.87
US$97 932.75
1000
US$184.34
US$184 344.00
Top