CDCE62005EVM

Mfr. #: CDCE62005EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR CDCE62005
生命週期: 製造商新產品
數據表: CDCE62005EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE62005EVM Overview

Product belongs to the CDCE62005 series. This product is categorized as Evaluation Modules Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 1.5 GHz range is 0Hz to 2.2GHz. The Timing, Frequency Synthesizer is the Main-Purpose. Primary-Attributes: 3 Inputs, 10 Outputs IC package type: CDCE62005 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDCE62005. USB interface type

CDCE62005EVM Image

CDCE62005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE62005EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series CDCE62005
  • Product Evaluation Modules
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 1.5 GHz
  • Main-Purpose Timing, Frequency Synthesizer
  • Primary-Attributes 3 Inputs, 10 Outputs
  • Embedded No
  • Utilized-IC-Part CDCE62005
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDCE62005
  • Interface-Type USB

CDCE62005EVM

CDCE62005EVM Specifications

CDCE62005EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is CDCE62005.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Frequency Synthesizers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 1.5 GHz.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Frequency Synthesizer

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 3 Inputs, 10 Outputs.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCE62005.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCE62005.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$298.50
US$298.50
10
US$283.58
US$2 835.75
100
US$268.65
US$26 865.00
500
US$253.72
US$126 862.50
1000
US$238.80
US$238 800.00
Top