CDCLVP2104EVM

Mfr. #: CDCLVP2104EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR CDCLVP2104
生命週期: 製造商新產品
數據表: CDCLVP2104EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP2104EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers Bulk is the packaging method for this product This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer / Driver / Receiver / Translator is the Main-Purpose. Primary-Attributes: 4 Inputs, 8 Outputs IC package type: CDCLVP2104 This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP2104.

CDCLVP2104EVM Image

CDCLVP2104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP2104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 200 MHz 2 GHz
  • Main-Purpose Timing, Clock Buffer / Driver / Receiver / Translator
  • Primary-Attributes 4 Inputs, 8 Outputs
  • Embedded No
  • Utilized-IC-Part CDCLVP2104
  • Operating-Supply-Voltage 2.375 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDCLVP2104

CDCLVP2104EVM

CDCLVP2104EVM Specifications

CDCLVP2104EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Buffers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 200 MHz 2 GHz.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Buffer / Driver / Receiver / Translator.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 4 Inputs, 8 Outputs.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCLVP2104.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.375 V to 3.6 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed CDCLVP2104

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$172.52
US$172.52
10
US$163.89
US$1 638.89
100
US$155.26
US$15 526.35
500
US$146.64
US$73 318.90
1000
US$138.01
US$138 012.00
Top