CDCLVP2106EVM

Mfr. #: CDCLVP2106EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR CDCLVP2106
生命週期: 製造商新產品
數據表: CDCLVP2106EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP2106EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDCLVP2106 Minimum operating temperature: - 40 C This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP2106.

CDCLVP2106EVM Image

CDCLVP2106EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP2106EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Frequency 200 MHz 2 GHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCLVP2106
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 2.375 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDCLVP2106

CDCLVP2106EVM

CDCLVP2106EVM Specifications

CDCLVP2106EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Buffers

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 200 MHz 2 GHz

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCLVP2106.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.375 V to 3.6 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCLVP2106.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$172.52
US$172.52
10
US$163.89
US$1 638.89
100
US$155.26
US$15 526.35
500
US$146.64
US$73 318.90
1000
US$138.01
US$138 012.00
Top