CDCM6208V2EVM

Mfr. #: CDCM6208V2EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR CDCM6208V2
生命週期: 製造商新產品
數據表: CDCM6208V2EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCM6208V2EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product The Timing, Frequency Synthesizer is the Main-Purpose. Primary-Attributes: USB Powered or External Supply IC package type: CDCM6208

CDCM6208V2EVM Image

CDCM6208V2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCM6208V2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Packaging Bulk
  • Main-Purpose Timing, Frequency Synthesizer
  • Primary-Attributes USB Powered or External Supply
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part CDCM6208

CDCM6208V2EVM

CDCM6208V2EVM Specifications

CDCM6208V2EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Frequency Synthesizer.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed USB Powered or External Supply

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCM6208.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$298.50
US$298.50
10
US$283.58
US$2 835.75
100
US$268.65
US$26 865.00
500
US$253.72
US$126 862.50
1000
US$238.80
US$238 800.00
Top