DAC3152EVM

Mfr. #: DAC3152EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DAC3152
生命週期: 製造商新產品
數據表: DAC3152EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC3152EVM Overview

Product belongs to the DAC3152 series. This product is categorized as Evaluation Boards Type: DAC This product operates at a 5 V to 7 V supply voltage for reliable performance. This tool is designed for the DAC3152.

DAC3152EVM Image

DAC3152EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC3152EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series DAC3152
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 5 V to 7 V
  • Tool-Is-For-Evaluation-Of DAC3152

DAC3152EVM

DAC3152EVM Specifications

DAC3152EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is DAC3152.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V to 7 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC3152.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$230.43
US$230.43
10
US$218.91
US$2 189.08
100
US$207.39
US$20 738.70
500
US$195.87
US$97 932.75
1000
US$184.34
US$184 344.00
Top