DAC5674EVM

Mfr. #: DAC5674EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DAC5674
生命週期: 製造商新產品
數據表: DAC5674EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5674EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DAC5674.

DAC5674EVM Image

DAC5674EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5674EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DAC5674

DAC5674EVM

DAC5674EVM Specifications

DAC5674EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC5674.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$28.64
US$28.64
10
US$27.20
US$272.03
100
US$25.77
US$2 577.15
500
US$24.34
US$12 169.90
1000
US$22.91
US$22 908.00
Top