DAC7311EVM

Mfr. #: DAC7311EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DAC7311
生命週期: 製造商新產品
數據表: DAC7311EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC7311EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 1.8 V to 5.5 V supply voltage for reliable performance. This tool is designed for the DAC7311. SPI interface type

DAC7311EVM Image

DAC7311EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC7311EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 1.8 V to 5.5 V
  • Tool-Is-For-Evaluation-Of DAC7311
  • Interface-Type SPI

DAC7311EVM

DAC7311EVM Specifications

DAC7311EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 5.5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC7311

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top