DAC8164EVM

Mfr. #: DAC8164EVM
製造商: Texas Instruments
描述: EVALUATION MODULE FOR DAC8164
生命週期: 製造商新產品
數據表: DAC8164EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8164EVM Overview

This product is categorized as Evaluation Boards Type: DAC This tool is designed for the DAC8164.

DAC8164EVM Image

DAC8164EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8164EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Tool-Is-For-Evaluation-Of DAC8164

DAC8164EVM

DAC8164EVM Specifications

DAC8164EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8164.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top