DAC8311EVM

Mfr. #: DAC8311EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DAC8311
生命週期: 製造商新產品
數據表: DAC8311EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8311EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 1.8 V to 5.5 V supply voltage for reliable performance. This tool is designed for the DAC8311. SPI interface type

DAC8311EVM Image

DAC8311EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8311EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 1.8 V to 5.5 V
  • Tool-Is-For-Evaluation-Of DAC8311
  • Interface-Type SPI

DAC8311EVM

DAC8311EVM Specifications

DAC8311EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 5.5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC8311.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$55.06
US$55.06
10
US$52.31
US$523.12
100
US$49.56
US$4 955.85
500
US$46.81
US$23 402.65
1000
US$44.05
US$44 052.00
Top