DAC8554EVM

Mfr. #: DAC8554EVM
製造商: Texas Instruments
描述: EVALUATION MODULE FOR DAC8554
生命週期: 製造商新產品
數據表: DAC8554EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8554EVM Overview

This product is categorized as Evaluation Boards Type: DAC This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8554. SPI interface type

DAC8554EVM Image

DAC8554EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8554EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8554
  • Interface-Type SPI

DAC8554EVM

DAC8554EVM Specifications

DAC8554EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 5 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8554.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top