DAC8564EVM

Mfr. #: DAC8564EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DAC8564
生命週期: 製造商新產品
數據表: DAC8564EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8564EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8564. SPI interface type

DAC8564EVM Image

DAC8564EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8564EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8564
  • Interface-Type SPI

DAC8564EVM

DAC8564EVM Specifications

DAC8564EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC8564.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$31.40
US$31.40
10
US$29.83
US$298.25
100
US$28.26
US$2 825.55
500
US$26.69
US$13 342.90
1000
US$25.12
US$25 116.00
Top