DRV110EVM

Mfr. #: DRV110EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DRV110
生命週期: 製造商新產品
數據表: DRV110EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV110EVM Overview

Product belongs to the DRV110 series. This product is categorized as Evaluation Modules Type: Current Mode PWM Controllers Bulk is the packaging method for this product This product is designed DRV110 DRV120 amplifier. The Power Management, Solenoid Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV110 Maximum operating temperature of + 35 C Minimum operating temperature: - 40 C This product is an DRV110A 14-pin TSSOP. This tool is designed for the DRV110 DRV120. Input Voltage Range: 7 V to 48 V 100 V to 240 V

DRV110EVM Image

DRV110EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV110EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV110
  • Product Evaluation Modules
  • Type Current Mode PWM Controllers
  • Packaging Bulk
  • For-Use-With DRV110 DRV120
  • Main-Purpose Power Management, Solenoid Control
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part DRV110
  • Maximum-Operating-Temperature + 35 C
  • Minimum-Operating-Temperature - 40 C
  • Description-Function DRV110A 14-pin TSSOP
  • Tool-Is-For-Evaluation-Of DRV110 DRV120
  • Input-Voltage 7 V to 48 V 100 V to 240 V

DRV110EVM

DRV110EVM Specifications

DRV110EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DRV110

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Current Mode PWM Controllers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed DRV110 DRV120

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Solenoid Control

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV110.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 35 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is DRV110A 14-pin TSSOP.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV110 DRV120.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 7 V to 48 V 100 V to 240 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$113.04
US$113.04
10
US$107.39
US$1 073.88
100
US$101.74
US$10 173.60
500
US$96.08
US$48 042.00
1000
US$90.43
US$90 432.00
Top