DRV201EVM

Mfr. #: DRV201EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DRV201
生命週期: 製造商新產品
數據表: DRV201EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV201EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Voice Coil Motor Driver for Camera Auto Focus IC package type: DRV201 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C Output voltage: - This tool is designed for the DRV201. I2C interface type Input Voltage Range: 2.5 V to 4.8 V Output current: 102.3 mA

DRV201EVM Image

DRV201EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV201EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Voice Coil Motor Driver for Camera Auto Focus
  • Embedded No
  • Utilized-IC-Part DRV201
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Output-Voltage -
  • Tool-Is-For-Evaluation-Of DRV201
  • Interface-Type I2C
  • Input-Voltage 2.5 V to 4.8 V
  • Output-Current 102.3 mA

DRV201EVM

DRV201EVM Specifications

DRV201EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Voice Coil Motor Driver for Camera Auto Focus.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV201

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 85 C.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed -

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV201.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2.5 V to 4.8 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 102.3 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$86.85
US$86.85
10
US$82.51
US$825.08
100
US$78.16
US$7 816.50
500
US$73.82
US$36 911.25
1000
US$69.48
US$69 480.00
Top