DRV595EVM

Mfr. #: DRV595EVM
製造商: Texas Instruments
描述: MODULE EVAL FOR DRV595
生命週期: 製造商新產品
數據表: DRV595EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV595EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Amplifiers This product is designed DRV595 amplifier. The Power Management, H-Bridge Driver (Internal FET) is the Main-Purpose. Primary-Attributes: - IC package type: DRV595 This product operates at a 4.5 V to 26 V supply voltage for reliable performance. This tool is designed for the DRV595. 3 A is 92 nA.

DRV595EVM Image

DRV595EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV595EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Amplifiers
  • For-Use-With DRV595
  • Main-Purpose Power Management, H-Bridge Driver (Internal FET)
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part DRV595
  • Operating-Supply-Voltage 4.5 V to 26 V
  • Tool-Is-For-Evaluation-Of DRV595
  • Operating-Supply-Current 3 A

DRV595EVM

DRV595EVM Specifications

DRV595EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Power Amplifiers.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV595.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, H-Bridge Driver (Internal FET).

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV595.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 4.5 V to 26 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV595

  • A: At what frequency does the Operating-Supply-Current?

    Q: The product Operating-Supply-Current is 3 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$223.50
US$223.50
10
US$212.32
US$2 123.25
100
US$201.15
US$20 115.00
500
US$189.98
US$94 987.50
1000
US$178.80
US$178 800.00
Top