DRV601EVM

Mfr. #: DRV601EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DRV601
生命週期: 製造商新產品
數據表: DRV601EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV601EVM Overview

Product belongs to the DirectPath series. Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 1.8 V ~ 4.5 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV601 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV601.

DRV601EVM Image

DRV601EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV601EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series DirectPath
  • Type Audio Amplifiers
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 1.8 V ~ 4.5 V
  • Max-Output-Power-x-Channels-Load -
  • Amplifier-Type Class AB
  • Supplied-Contents Board
  • Utilized-IC-Part DRV601
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DRV601

DRV601EVM

DRV601EVM Specifications

DRV601EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DirectPath.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifiers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is 2-Channel (Stereo).

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 1.8 V ~ 4.5 V.

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is -.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Class AB.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV601.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV601.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$114.63
US$114.63
10
US$108.90
US$1 088.98
100
US$103.17
US$10 316.70
500
US$97.44
US$48 717.75
1000
US$91.70
US$91 704.00
Top